Cookies and the protection of your data

We use cookies to improve the functionality of the website, to offer you a better website experience and to provide social media features. You give your consent by clicking on “Accept all Cookies” or as part of your individual settings. Please find detailed information on the use of cookies on this website in our Data Privacy Statement.

Functional Cookies

These cookies are necessary for the operation of the site and enable security-relevant functions. In addition, we determine whether you want to remain logged in and to make our services available to you when you change between this and other websites.

Statistical Cookies

These cookies are used for analyzing user behavior on our website with the aim of improving user navigation. All data collected is evaluated anonymously. Further information is available on our data protection site.

Marketing Cookies

These cookies are used to deliver relevant advertising or to limit how many times you see an ad. Marketing cookies can share that information with the advertiser (third-party cookies). The legal basis for the data processing is the consent of the user.

Energy Storage System For Railway  with SCiB™
Energy Storage System For Railway  with SCiB™
Energy Storage System For Railway  with SCiB™
Energy Storage System For Railway  with SCiB™
Energy Storage System For Railway  with SCiB™
Energy Storage System For Railway  with SCiB™
Energy Storage System For Railway  with SCiB™
Energy Storage System For Railway  with SCiB™
Energy Storage System For Railway  with SCiB™
Energy Storage System For Railway  with SCiB™
2021

Share:

Energy Storage System For Railway with SCiB™

Electric train storage system UI

The Energy Storage System (ESS) with SCiB™ (Toshiba’s rechargeable battery) charges and discharges regenerative power to provide safe and stable power supply to trains, especially during emergency power failures. A simple monitoring system is essential to ensure continuous operation of the ESS. This graphic user interface (GUI) with strong visual design offers just that by offering a clear, intuitive display of ESS operation. System status such as output power, battery status, fault information, and measured data are displayed in real-time and can be quickly grasped by the users.

Client / Manufacturer

Toshiba Infrastructure Systems & Solutions Corporation

Kanagawa, JP
Design
Toshiba Corporation

Toshiba Corporation

Tokyo, JP
Date of Launch
2021
Development Time
13 - 24 months
Target Regions
Asia, Europe
Target Groups
Specific sub-group: Facility management department of railway operator, Operation commander and Site maintenance staff

RELATED PROJECTS