Cookies and the protection of your data

We use cookies to improve the functionality of the website, to offer you a better website experience and to provide social media features. You give your consent by clicking on “Accept all Cookies” or as part of your individual settings. Please find detailed information on the use of cookies on this website in our Data Privacy Statement.

Functional Cookies

These cookies are necessary for the operation of the site and enable security-relevant functions. In addition, we determine whether you want to remain logged in and to make our services available to you when you change between this and other websites.

Statistical Cookies

These cookies are used for analyzing user behavior on our website with the aim of improving user navigation. All data collected is evaluated anonymously. Further information is available on our data protection site.

Marketing Cookies

These cookies are used to deliver relevant advertising or to limit how many times you see an ad. Marketing cookies can share that information with the advertiser (third-party cookies). The legal basis for the data processing is the consent of the user.

Family Art Museum
Family Art Museum
Family Art Museum
Family Art Museum
2017

Share:

Family Art Museum

Renovation project

This residence has only a dozen square meters, but it can give full play to its functions and embodies elegance and comfort. The first floor is two meters high and the second floor is only 1.5 m high. So the space adopts “open to below” and the two windows near the street can address the issue of lighting. So when designer Daohua Liu was making the overall planning, he adopted the Family Art Museum design concept. Because the male host suffers from asthma, we built an oxygen system for him, through which he can directly inhale oxygen on the second floor.

Client / Manufacturer

BEIJING HUAKAI BUILDING DECORATION ENGINEERING CO., Ltd.

Beijing, CN
Design

BEIJING HUAKAI BUILDING DECORATION ENGINEERING CO., Ltd.

Beijing, CN
Date of Launch
2015
Development Time
up to 12 months
Target Regions
Asia
Target Groups
Consumer / User, Public Sector / Government

RELATED PROJECTS